Office · Santa Clara, California

The Atrium At Lakeside

The Atrium At Lakeside is financed with a $16.5M CMBS loan at 6.71% that reaches maturity on August 11, 2031, in 4 years and 9 months. As of the Sep 2026 servicer report, the latest filed for this loan, its status is current.

The loan

Balance in tracked trusts
$16,500,000
Original balance (same notes)
$16,500,000
Interest rate
6.71% fixed
Originated
July 22, 2026
Maturity
August 11, 2031
Payments
Interest only for the full term
Prepayment lockout ends
February 10, 2031
Master servicer
Midland Loan Services
Originator
Wells Fargo Bank, National Association

Status

Payment status
Current (code 0)
Special servicing
No transfer reported
Defeasance
None reported

The property

Address
2880 Lakeside Drive, Santa Clara, CA 95054
Metro
San Jose-Sunnyvale-Santa Clara, CA
Rentable area
99,335 sq ft
Built
1986, renovated 2021
Largest tenants
Elevated Materials US, LLC; Swinerton Builders; IPValue Management, Inc
Value at securitization
$31.2M (Jun 2026)

Performance

Underwritten figures against the most recent reported figures
At securitizationLatest
DSCR (NOI)2.52xn/a
Occupancy83%n/a
Net operating income$2.8Mn/a

Watch flags

Computed from the BMO 2026-5C16 Mortgage Trust filing for the reporting period ending September 11, 2026, filed with the SEC October 2, 2026.

  • Largest tenant's lease ends within 12 months

cmbs.news's own rule-based labels on the filed fields (definitions), not a credit rating, a prediction or a view of the borrower.

What the filing shows

  • The filing gives Apr 2027 as the lease end date for the largest tenant (Elevated Materials US, LLC), before the loan matures. Lenders look hard at that rollover.

The last 2 monthly reports

Report monthBalancePayment statusSpecial servicerDSCROccupancy
September 2026$16.5MCurrentNon/an/a
August 2026$16.5MPayment not received but still in grace period or not yet dueNon/an/a

From each trust's ABS-EE filing for that month. Coverage and occupancy change only when the servicer reports new statements. If one trust holding a piece of the loan skipped a month, that month's balance reads low.

Where the loan sits

One trust holds this loan in the data.

TrustLoan no.BalanceReport periodSource
BMO 2026-5C16 Mortgage Trust18$16,500,000Sep 2026SEC filing, October 2, 2026

Alert me when this loan changes

One email after any monthly filing that changes this loan: a move to or from the special servicer, a payment status of 30+ days late or matured, a paydown of 1% or more, or coverage moving 0.15x or occupancy 5 points. Privacy

Other San Jose-Sunnyvale-Santa Clara loans due in 2031

Property Location Type Balance Rate Matures DSCR Occ. Status
The Towers at Cupertino City Center Cupertino, CA Office $145.0M 6.442% Mar 2031 n/a n/a Current
520 Almanor Sunnyvalle, CA Mixed use $101.6M 2.555% Nov 2031 5.76x 98% Current
HQ at First San Jose, CA Office $98.7M 2.97% Aug 2031 n/a n/a Current
The Assembly San Jose, CA Industrial $97.5M 7.03% Oct 2031 n/a n/a Current
PATHLINE PARK 9 and 10 Sunnyvale, CA Office $90.0M 2.502% Feb 2031 4.75x 100% Current
2600 El Camino Real Palo Alto, CA Office $46.4M 3.734% Apr 2031 3.02x 92% Current
5300-5350 Hellyer Avenue San Jose, CA Office $44.0M 3.913% Nov 2031 1.30x 100% Current
110 120 and 130 Holger Way San Jose, CA Office $42.3M 2.97% Aug 2031 2.18x 100% Current

All loans maturing in 2031 · All San Jose-Sunnyvale-Santa Clara loans

Source: each trust's ABS-EE asset-data exhibit (Regulation AB Schedule AL) on SEC EDGAR, reporting period ending September 11, 2026. Servicers report these figures; cmbs.news does not audit them. How this page is built.