Mixed use · Chicago, Illinois

Kinzie Design Center

Kinzie Design Center is financed with a $15.4M CMBS loan at 4.73% that reaches maturity on April 1, 2028, in 17 months. As of the Sep 2026 servicer report, the latest filed for this loan, its status is current.

The loan

Balance in tracked trusts
$15,400,000
Original balance (same notes)
$15,400,000
Interest rate
4.73% fixed
Originated
March 5, 2018
Maturity
April 1, 2028
Payments
Interest only for the full term
Prepayment lockout ends
January 31, 2028
Master servicer
Trimont LLC
Originator
KeyBank National Association

Status

Payment status
Current (code 0)
Special servicing
No transfer reported
Defeasance
None reported

The property

Address
218-230 West Kinzie Street and 401 North Franklin Street, Chicago, IL 60654
Metro
Chicago-Naperville-Elgin, IL-IN
Rentable area
76,053 sq ft
Built
1880, renovated 2008
Largest tenants
Chartis Group LLC; 218 KINZIE RESTAURAN; INTERNATIONAL ORANGE
Value at securitization
$31.0M (Jan 2018)

Performance

Underwritten figures against the most recent reported figures
At securitizationLatest (Dec 2025)
DSCR (NOI)2.23x2.53x
Occupancy94%87%
Net operating income$1.7M$1.9M
Debt yield12.1%

Debt yield here is the latest NOI divided by the balance held in the trusts below. If part of the loan sits outside them, the true figure is lower.

Watch flags

Computed from the UBS Commercial Mortgage Trust 2018-C10 filing for the reporting period ending September 11, 2026, filed with the SEC September 28, 2026.

  • Largest tenant's lease ends within 12 months

cmbs.news's own rule-based labels on the filed fields (definitions), not a credit rating, a prediction or a view of the borrower.

What the filing shows

  • Occupancy has fallen from 94% when the loan was securitized to 87%.
  • Net operating income is 13% above the underwritten figure ($1.9M a year against $1.7M).
  • Debt service coverage moved from 2.23x at securitization to 2.53x on the latest statements.
  • The filing gives Jul 2027 as the lease end date for the largest tenant (Chartis Group LLC), before the loan matures. Lenders look hard at that rollover.

The last 12 monthly reports

Report monthBalancePayment statusSpecial servicerDSCROccupancy
September 2026$15.4MCurrentNo2.53x87%
August 2026$15.4MCurrentNo2.53x87%
July 2026$15.4MCurrentNo2.53x87%
June 2026$15.4MCurrentNo2.53x87%
May 2026$15.4MCurrentNo2.53x87%
April 2026$15.4MCurrentNo2.53x87%
March 2026$15.4MCurrentNo2.80x90%
February 2026$15.4MCurrentNo2.80x90%
January 2026$15.4MCurrentNo2.80x90%
December 2025$15.4MCurrentNo2.80x90%
November 2025$15.4MCurrentNo1.95x91%
October 2025$15.4MCurrentNo1.95x91%

From each trust's ABS-EE filing for that month. Coverage and occupancy change only when the servicer reports new statements. If one trust holding a piece of the loan skipped a month, that month's balance reads low.

Where the loan sits

One trust holds this loan in the data.

TrustLoan no.BalanceReport periodSource
UBS Commercial Mortgage Trust 2018-C1018$15,400,000Sep 2026SEC filing, September 28, 2026

Alert me when this loan changes

One email after any monthly filing that changes this loan: a move to or from the special servicer, a payment status of 30+ days late or matured, a paydown of 1% or more, or coverage moving 0.15x or occupancy 5 points. Privacy

Other Chicago-Naperville-Elgin loans due in 2028

Property Location Type Balance Rate Matures DSCR Occ. Status
333 S Wabash Chicago, IL Office $99.7M 3.53% Sep 2028 1.70x 81% Current
Westbrook Corporate Center Westchester, IL Office $86.4M 4.86% Jun 2028 1.30x 68% With the special servicer and 90+ days delinquent
Continental Towers Rolling Meadows, IL Office $84.5M 4.75% Sep 2028 0.31x 53% With the special servicer and 90+ days delinquent
Executive Towers West Downers Grove, IL Office $54.2M 4.85% Aug 2028 1.23x 63% Current
The Buckingham Chicago, IL Multifamily $42.3M 5.522% Aug 2028 1.18x n/a With the special servicer and 90+ days delinquent
Oak Creek Center Lombard, IL Office $34.6M 4.80% Mar 2028 n/a n/a Current
One Parkway North Fee Deerfield, IL Other $24.5M 4.282% Jan 2028 1.91x 81% With the special servicer and 90+ days delinquent
Willows Hotel Chicago Chicago, IL Hotel $20.7M 5.155% Jan 2028 n/a n/a Current

All loans maturing in 2028 · All Chicago-Naperville-Elgin loans

Source: each trust's ABS-EE asset-data exhibit (Regulation AB Schedule AL) on SEC EDGAR, reporting period ending September 11, 2026. Servicers report these figures; cmbs.news does not audit them. How this page is built.