Hotel · Charlotte, North Carolina

Hilton at University Place

Public CMBS trusts hold $40.4M of the loan on Hilton at University Place at 5.10% that reaches maturity on April 6, 2029, in 2 years and 5 months. As of the Sep 2026 servicer report, the latest filed for this loan, its status is current.

The loan

Balance in tracked trusts
$40,446,300
Original balance (same notes)
$46,000,000
Interest rate
5.10% fixed
Originated
April 4, 2019
Maturity
April 6, 2029
Payments
Amortizing over 30 years
Prepayment lockout ends
January 5, 2029
Master servicer
Trimont LLC
Originator
Barclays Capital Real Estate Inc.

Status

Payment status
Current (code 0)
Special servicing
No transfer reported
Defeasance
None reported

The property

Address
8629 Jm Keynes Drive, Charlotte, NC 28262
Metro
Charlotte-Concord-Gastonia, NC-SC
Units, rooms or beds
393
Built
1988, renovated 2016
Value at securitization
$69.5M (Feb 2019)

Performance

Underwritten figures against the most recent reported figures
At securitizationLatest (Mar 2026)
DSCR (NOI)2.03x1.86x
Occupancy74%70%
Net operating income$6.1M$5.6M
Debt yield13.8%

Debt yield here is the latest NOI divided by the balance held in the trusts below. If part of the loan sits outside them, the true figure is lower.

Watch flags

Computed from the Wells Fargo Commercial Mortgage Trust 2019-C51 filing for the reporting period ending September 11, 2026, filed with the SEC September 29, 2026.

None this month. No flag in the cmbs.news screen applies to this loan.

cmbs.news's own rule-based labels on the filed fields (definitions), not a credit rating, a prediction or a view of the borrower.

What the filing shows

  • Occupancy has fallen from 74% when the loan was securitized to 70%.
  • Net operating income is 8% below the underwritten figure ($5.6M a year against $6.1M).
  • Debt service coverage moved from 2.03x at securitization to 1.86x on the latest statements.

The last 12 monthly reports

Report monthBalancePayment statusSpecial servicerDSCROccupancy
September 2026$40.4MCurrentNo1.86x70%
August 2026$40.5MCurrentNo1.86x70%
July 2026$40.6MCurrentNo1.86x70%
June 2026$40.7MCurrentNo1.79x67%
May 2026$40.7MCurrentNo1.78x66%
April 2026$40.8MCurrentNo1.78x66%
March 2026$40.9MCurrentNo1.78x66%
February 2026$41.0MCurrentNo1.78x66%
January 2026$41.0MCurrentNo1.78x66%
December 2025$41.1MCurrentNo1.78x66%
November 2025$41.2MCurrentNo1.71x65%
October 2025$41.3MCurrentNo1.71x65%

From each trust's ABS-EE filing for that month. Coverage and occupancy change only when the servicer reports new statements. If one trust holding a piece of the loan skipped a month, that month's balance reads low.

Where the loan sits

The loan is split into 2 notes held by different trusts. Each trust reports its own piece.

Alert me when this loan changes

One email after any monthly filing that changes this loan: a move to or from the special servicer, a payment status of 30+ days late or matured, a paydown of 1% or more, or coverage moving 0.15x or occupancy 5 points. Privacy

Other Charlotte-Concord-Gastonia loans due in 2029

Property Location Type Balance Rate Matures DSCR Occ. Status
Innovation Park Charlotte, NC Office $182.3M 3.505% Nov 2029 1.22x 49% Current
Panorama Tower Charlotte, NC Mixed use $71.5M 7.37% Mar 2029 2.06x 72% Current
Whitehall III & V Charlotte, NC Office $31.5M 3.693% Dec 2029 1.86x 88% Current
Queen's Grant Charlotte, NC Manufactured housing $29.7M 6.40% Sep 2029 n/a n/a Current
Gateway Center Charlotte, NC Office $28.4M 4.95% Apr 2029 -0.54x 9% With the special servicer and 90+ days delinquent
Sharon Square Charlotte, NC Office $24.4M 4.47% Dec 2029 1.35x 79% Current
Compucom World Headquarters Fort Mill, SC Office $23.5M 5.06% Jan 2029 1.79x 100% Current
Ncdc Statesville, NC Mixed use $20.5M 4.75% May 2029 n/a n/a Current

All loans maturing in 2029 · All Charlotte-Concord-Gastonia loans

Source: each trust's ABS-EE asset-data exhibit (Regulation AB Schedule AL) on SEC EDGAR, reporting period ending September 11, 2026. Servicers report these figures; cmbs.news does not audit them. How this page is built.