Office · Brownsville, Texas

Wellington Plaza

Wellington Plaza is financed with a $3.1M CMBS loan at 5.86% that reaches maturity on November 11, 2028, in 2 years. As of the Sep 2026 servicer report, the latest filed for this loan, its status is current.

The loan

Balance in tracked trusts
$3,084,910
Original balance (same notes)
$3,600,000
Interest rate
5.86% fixed
Originated
October 22, 2018
Maturity
November 11, 2028
Payments
Amortizing over 27 years
Prepayment lockout ends
August 10, 2028
Master servicer
Trimont LLC
Originator
Wells Fargo Bank, National Association

Status

Payment status
Current (code 0)
Special servicing
No transfer reported
Defeasance
None reported

The property

Address
844 West Price Road; 2280 and 2390 Central Boulevard, Brownsville, TX 78520
Metro
Brownsville-Harlingen, TX
Rentable area
52,829 sq ft
Built
1978, renovated 1998
Largest tenants
Valley Doctors Clinic of Brownsville; Rio Grande Oral & Maxillofacial Surgery; Green Planet Services LLC.
Value at securitization
$5.1M (Aug 2018)

Performance

Underwritten figures against the most recent reported figures
At securitizationLatest (Dec 2024)
DSCR (NOI)1.56x1.53x
Occupancy85%88%
Net operating income$415K$406K
Debt yield13.2%

Debt yield here is the latest NOI divided by the balance held in the trusts below. If part of the loan sits outside them, the true figure is lower.

Watch flags

Computed from the BANK 2019-BNK16 filing for the reporting period ending September 11, 2026, filed with the SEC September 29, 2026.

  • Largest tenant's lease ends within 12 months

cmbs.news's own rule-based labels on the filed fields (definitions), not a credit rating, a prediction or a view of the borrower.

What the filing shows

  • Occupancy has risen from 85% when the loan was securitized to 88%.
  • The filing gives Mar 2027 as the lease end date for the largest tenant (Valley Doctors Clinic of Brownsville), before the loan matures. Lenders look hard at that rollover.

The last 11 monthly reports

Report monthBalancePayment statusSpecial servicerDSCROccupancy
September 2026$3.1MCurrentNo1.53x88%
August 2026$3.1MCurrentNo1.53x88%
July 2026$3.1MCurrentNo1.53x88%
June 2026$3.1MCurrentNo1.53x88%
May 2026$3.1MCurrentNo1.53x88%
March 2026$3.1MCurrentNo1.53x88%
February 2026$3.1MCurrentNo1.53x88%
January 2026$3.1MCurrentNo1.53x88%
December 2025$3.1MCurrentNo1.53x88%
November 2025$3.2MCurrentNo1.53x88%
October 2025$3.2MCurrentNo1.53x88%

From each trust's ABS-EE filing for that month. Coverage and occupancy change only when the servicer reports new statements. If one trust holding a piece of the loan skipped a month, that month's balance reads low.

Where the loan sits

One trust holds this loan in the data.

TrustLoan no.BalanceReport periodSource
BANK 2019-BNK1652$3,084,910Sep 2026SEC filing, September 29, 2026

Alert me when this loan changes

One email after any monthly filing that changes this loan: a move to or from the special servicer, a payment status of 30+ days late or matured, a paydown of 1% or more, or coverage moving 0.15x or occupancy 5 points. Privacy

Other Brownsville-Harlingen loans due in 2028

Property Location Type Balance Rate Matures DSCR Occ. Status
Sealy Distribution Center Brownsville, TX Industrial $15.5M 4.78% Nov 2028 3.63x 99% Current
Residence Inn Harlingen Harlingen, TX Hotel $7.9M 5.623% Jun 2028 3.38x 93% Current
Boca Chica Plaza Brownsville, TX Retail $5.1M 5.05% Mar 2028 2.38x 98% Current
Walgreens - Harlingen, TX Harlingen, TX Retail $3.3M 4.84% Feb 2028 1.89x 100% Current

All loans maturing in 2028 · All Brownsville-Harlingen loans

Source: each trust's ABS-EE asset-data exhibit (Regulation AB Schedule AL) on SEC EDGAR, reporting period ending September 11, 2026. Servicers report these figures; cmbs.news does not audit them. How this page is built.