Industrial · Glendale, Arizona

Southwest Gas

7326 North Glen Harbor Boulevard, Glendale, AZ · Google Maps

BANK 2019-BNK22's 10-D report of October 19, 2026 lists the CMBS loan on Southwest Gas with $5.6M outstanding at 3.57%, paid through October 11, 2026; it reaches its anticipated repayment date on September 11, 2029. The trust's monthly asset file has left the loan out since August 2025, so the other figures here are from the last one that listed it, for the period ending July 11, 2025, and the loan has no current status.

The loan

Balance on the 10-D of October 19, 2026
$5,630,000
Paid through, on the 10-D
October 11, 2026
Balance on the asset file for Jul 2025
$5,630,000
Original balance (same notes)
$5,630,000
Interest rate
3.57% fixed
Originated
August 28, 2019
Maturity
September 11, 2032
Anticipated repayment date
September 11, 2029 (the rate steps up if the loan is not repaid by then)
Payments
Interest only for the full term
Prepayment lockout ends
March 10, 2029
Master servicer
Trimont LLC
Originator
Wells Fargo Bank, National Association

Status on the asset file for Jul 2025

Payment status
Current (code 0)
Special servicing
No transfer reported
Defeasance
None reported

What the trust's asset file said for the period ending July 11, 2025. Its later files leave the loan out, so nothing newer is known here beyond the 10-D's paid-through date, October 11, 2026. Why.

The property

Address
7326 North Glen Harbor Boulevard, Glendale, AZ 85307
Metro
Phoenix-Mesa-Chandler, AZ
Rentable area
52,330 sq ft
Built
2013
Largest tenants
Centuri Construction Group Inc.
Value at securitization
$9.0M (Jul 2019)

Performance

Underwritten figures against the most recent reported figures
MeasureAt securitizationLatest (Dec 2022)
DSCR (NOI)3.00x2.95x
Occupancy100%100%
Net operating income$613K$603K
Debt yield10.7%

Debt yield here is the latest NOI divided by the balance held in the trusts below. If part of the loan sits outside them, the true figure is lower.

Comparable loans: industrial properties in Phoenix-Mesa-Chandler, AZ, with NOI, occupancy and value.

Watch flags

None: the trust's latest asset file leaves this loan out, so there is no current filing to read them from. The loan counts in no list, total or watch figure on this site until a filing lists it again.

Who is behind this loan

Parties and contacts named by the trust
Shown with Pro

Source: SEC Form 10-D, Exhibit 99.1 distribution statement, filed Oct 2026.

See names and contacts with Pro

Refinance test on today's income

The latest annual NOI in the filing is $603K, a debt yield of 10.7% on $5.6M. Lenders often size a new loan so NOI is at least 9% to 10% of the loan amount.

Debt yield a lender requiresLargest loanAgainst today's balance
9%$6.7M $1.1M of room
10%$6.0M $405K of room

Arithmetic on the filed NOI only: no rates, reserves, cap rates or lender terms. NOI can be a year old; see the statement dates above.

Refinance and early payoff, at today's rates

This estimate uses today's Treasury curve and needs JavaScript.

Rough estimates, not quotes. New loan: the filed NOI divided by the coverage you set, at the Treasury yield for the term plus your spread. Early payoff: the present value of the remaining scheduled payments to the open date at today's Treasury yields, less the balance, which is roughly what defeasance or yield maintenance costs. Loan documents, fees and the securities bought change the real number. Treasury yields: U.S. Treasury daily par curve.

Where the loan sits

One trust holds this loan in the data.

TrustAsset no. in that trustBalanceReport periodSource
BANK 2019-BNK22 39 $5,630,000on the 10-D of October 19, 2026, paid through October 11, 2026 Jul 2025the last asset file to list it SEC filing, July 29, 2025; 10-D

BANK 2019-BNK22's monthly asset file leaves out the note marked above, since August 2025, while the trust's 10-D still reports it. Its balance is the 10-D's; its other figures are from the last asset file that listed it. Why.

Other Phoenix-Mesa-Chandler loans due in 2029

Property Location Type Balance Rate Matures DSCR Occ. Status
3900 Camelback Phoenix, AZ Office $37.5M 3.48% Dec 2029 1.93x 24% Current
4041 Central Phoenix, AZ Office $36.6M 3.66% Oct 2029 1.90x 71% Delinquent
Embassy Suites Scottsdale Scottsdale, AZ Hotel $35.5M 5.915% Feb 2029 2.18x 70% Not reported
Riverwalk Business Park Scottsdale, AZ Office $34.5M 7.718% Dec 2029 2.39x 95% Current
Papago Gateway Center Tempe, AZ Office $34.0M 8.248% Mar 2029 2.32x 99% Current
Marriott Phoenix Airport Phoenix, AZ Hotel $33.8M 4.128% Dec 2029 3.79x 69% Current
Scottsdale Center Scottsdale, AZ Office $24.4M 5.145% Jan 2029 2.68x 98% Current
Greenway Park Plaza Phoenix, AZ Retail $19.0M 3.80% Oct 2029 2.00x 97% Current

All loans maturing in 2029 · All Phoenix-Mesa-Chandler loans

Source: each trust's ABS-EE asset-data exhibit (Regulation AB Schedule AL) on SEC EDGAR, reporting period ending July 11, 2025, and the trust's 10-D report of October 19, 2026 for the balance and paid-through date. Servicers report these figures; cmbs.news does not audit them. How this page is built.

Something wrong with this loan?