Office · Alexandria, Virginia

Poplar Run

Poplar Run is financed with a $16.2M CMBS loan at 3.39% that reaches maturity on December 6, 2031, in 5 years and 1 month. As of the Sep 2026 servicer report, the latest filed for this loan, its status is current.

The loan

Balance in tracked trusts
$16,219,860
Original balance (same notes)
$17,955,000
Interest rate
3.39% fixed
Originated
November 9, 2021
Maturity
December 6, 2031
Payments
Amortizing over 30 years
Prepayment lockout ended
January 5, 2024
Prepayment premium ends
September 5, 2031 (yield maintenance)
Master servicer
Trimont LLC
Originator
BSPRT CMBS Finance, LLC

Status

Payment status
Current (code 0)
Special servicing
No transfer reported
Defeasance
Partly defeased

The property

Address
5285 Shawnee Road, Alexandria, VA 22312
Metro
Washington-Arlington-Alexandria, DC-VA-MD-WV
Rentable area
148,881 sq ft
Built
1989, renovated 2021
Largest tenants
Modern Technology Solutions Inc.; Washington Gas Light Company; Mayvin Inc.
Value at securitization
$25.6M (Sep 2021)

Performance

Underwritten figures against the most recent reported figures
At securitizationLatest (Jun 2026)
DSCR (NOI)2.14x2.55x
Occupancy83%95%
Net operating income (annualized from 6 months)$2.0M$2.5M
Debt yield15.2%

Debt yield here is the latest NOI divided by the balance held in the trusts below. If part of the loan sits outside them, the true figure is lower.

Watch flags

Computed from the Wells Fargo Commercial Mortgage Trust 2021-C61 filing for the reporting period ending September 11, 2026, filed with the SEC September 29, 2026.

None this month. No flag in the cmbs.news screen applies to this loan.

cmbs.news's own rule-based labels on the filed fields (definitions), not a credit rating, a prediction or a view of the borrower.

What the filing shows

  • Occupancy has risen from 83% when the loan was securitized to 95%.
  • Net operating income is 20% above the underwritten figure ($2.5M a year against $2.0M; the latest statement covers 6 months, annualized).
  • Debt service coverage moved from 2.14x at securitization to 2.55x on the latest statements.

The last 12 monthly reports

Report monthBalancePayment statusSpecial servicerDSCROccupancy
September 2026$16.2MCurrentNo2.55x95%
August 2026$16.3MCurrentNo2.55x95%
July 2026$16.3MCurrentNo2.18x95%
June 2026$16.3MCurrentNo2.18x95%
May 2026$16.3MCurrentNo2.18x95%
April 2026$16.4MCurrentNo2.69x94%
March 2026$16.4MCurrentNo2.69x94%
February 2026$16.5MCurrentNo2.69x94%
January 2026$16.5MCurrentNo2.51x94%
December 2025$16.5MCurrentNo2.51x94%
November 2025$16.5MCurrentNo2.51x94%
October 2025$16.6MCurrentNo2.49x94%

From each trust's ABS-EE filing for that month. Coverage and occupancy change only when the servicer reports new statements. If one trust holding a piece of the loan skipped a month, that month's balance reads low.

Where the loan sits

One trust holds this loan in the data.

TrustLoan no.BalanceReport periodSource
Wells Fargo Commercial Mortgage Trust 2021-C6113$16,219,860Sep 2026SEC filing, September 29, 2026

Alert me when this loan changes

One email after any monthly filing that changes this loan: a move to or from the special servicer, a payment status of 30+ days late or matured, a paydown of 1% or more, or coverage moving 0.15x or occupancy 5 points. Privacy

Other Washington-Arlington-Alexandria loans due in 2031

Property Location Type Balance Rate Matures DSCR Occ. Status
1100 First Street NE Washington, DC Office $146.0M 3.002% Oct 2031 n/a n/a With the special servicer and 30-59 days delinquent
Project Embassy Washington, DC Mixed use $140.0M 7.542% Aug 2031 n/a n/a Current
Three Constitution Square Washington, DC Office $96.0M 2.579% May 2031 5.35x 100% Current
National Cancer Institute Center Frederick, MD Office $83.0M 2.759% Jun 2031 4.24x 100% Current
Unizo Four for 1100 First Street Washington, DC Office $65.0M 3.002% Oct 2031 n/a n/a With the special servicer and 90+ days delinquent
Mall at Prince Georges Hyattsville, MD Retail $57.9M 7.355% Jun 2031 n/a n/a Current
The Landing at Woodyard Clinton, MD Retail $44.5M 3.74% Jul 2031 2.30x 100% Current
Crescent Gateway Bethesda, MD Mixed use $43.0M 4.03% Feb 2031 1.55x 100% Current

All loans maturing in 2031 · All Washington-Arlington-Alexandria loans

Source: each trust's ABS-EE asset-data exhibit (Regulation AB Schedule AL) on SEC EDGAR, reporting period ending September 11, 2026. Servicers report these figures; cmbs.news does not audit them. How this page is built.