Multifamily portfolio, 3 properties · Fairfax, Virginia

Ellipse at Fairfax Corner

Public CMBS trusts hold $70.0M of the loan on this portfolio at 4.667% that reaches maturity on January 6, 2029, in 2 years and 2 months. As of the Sep 2026 servicer report, the latest filed for this loan, its status is current.

The loan

Balance in tracked trusts
$70,000,000
Original balance (same notes)
$70,000,000
Interest rate
4.667% fixed
Originated
December 18, 2018
Maturity
January 6, 2029
Payments
Interest only for the full term
Prepayment lockout ends
October 5, 2028
Master servicer
KeyBank National Association
Originator
CCRE

Status

Payment status
Current (code 0)
Special servicing
No transfer reported
Defeasance
None reported

The property

Address
11842 Federalist Way, Fairfax, VA
Metro
Washington-Arlington-Alexandria, DC-VA-MD-WV
Value at securitization
$251.5M

Performance

Underwritten figures against the most recent reported figures
At securitizationLatest
DSCR (NOI)n/an/a
Occupancyn/an/a
Net operating income$12.1Mn/a

Watch flags

Computed from the CF 2019-CF1 Mortgage Trust filing for the reporting period ending September 11, 2026, filed with the SEC September 30, 2026.

None this month. No flag in the cmbs.news screen applies to this loan.

cmbs.news's own rule-based labels on the filed fields (definitions), not a credit rating, a prediction or a view of the borrower.

Properties securing the loan

PropertyLocationTypeOccupancyDSCR
Ellipse at Fairfax CornerFairfax, VAMultifamilyn/an/a
Townes at HerndonHerndon, VAMultifamilyn/an/a
Windsor at Fair LakesFairfax, VAMultifamilyn/an/a

The last 12 monthly reports

Report monthBalancePayment statusSpecial servicerDSCROccupancy
September 2026$70.0MCurrentNo1.87x96%
August 2026$70.0MCurrentNo1.87x96%
July 2026$70.0MCurrentNo1.84x95%
June 2026$70.0MCurrentNo1.84x95%
May 2026$70.0MCurrentNo1.84x95%
April 2026$70.0MCurrentNo2.23x93%
March 2026$70.0MCurrentNo2.23x93%
February 2026$70.0MCurrentNo2.23x93%
January 2026$70.0MCurrentNo2.23x93%
December 2025$70.0MCurrentNo2.23x93%
November 2025$70.0MCurrentNo3.50x94%
October 2025$70.0MCurrentNo3.50x94%

From each trust's ABS-EE filing for that month. Coverage and occupancy change only when the servicer reports new statements. If one trust holding a piece of the loan skipped a month, that month's balance reads low.

Where the loan sits

The loan is split into 4 notes held by different trusts. Each trust reports its own piece.

Alert me when this loan changes

One email after any monthly filing that changes this loan: a move to or from the special servicer, a payment status of 30+ days late or matured, a paydown of 1% or more, or coverage moving 0.15x or occupancy 5 points. Privacy

Other Washington-Arlington-Alexandria loans due in 2029

Property Location Type Balance Rate Matures DSCR Occ. Status
Parklawn Building Rockville, MD Office $261.6M 3.398% Nov 2029 2.79x 73% Current
1812 North Moore Arlington, VA Office $172.7M 7.53% May 2029 0.96x 99% Late, less than 30 days
Uline Arena Washington, DC Mixed use $120.0M 4.04% Aug 2029 1.68x 94% Current
425 Eye Street Washington, DC Office $102.2M 1.00% Jan 2029 3.57x 77% Current
2001 K Street Washington, DC Office $95.0M 7.388% May 2029 1.43x 97% Current
Tysons Corner Center - Office Tower McLean, VA Office $95.0M 3.33% Oct 2029 n/a n/a Current
Potomac Tower Arlington, VA Office $84.0M 7.60% Sep 2029 1.66x 100% Current
Powered Shell Portfolio - Manassas DC-18 Manassas, VA Industrial $83.8M 3.637% Jul 2029 n/a n/a Current

All loans maturing in 2029 · All Washington-Arlington-Alexandria loans

Source: each trust's ABS-EE asset-data exhibit (Regulation AB Schedule AL) on SEC EDGAR, reporting period ending September 11, 2026. Servicers report these figures; cmbs.news does not audit them. How this page is built.