Office · Houston, Texas

1500 Post Oak Boulevard

Public CMBS trusts hold $140.0M of the loan on 1500 Post Oak Boulevard at 6.747% that reaches maturity on March 6, 2031, in 4 years and 4 months. As of the Sep 2026 servicer report, the latest filed for this loan, its status is current.

The loan

Balance in tracked trusts
$140,000,000
Original balance (same notes)
$140,000,000
Interest rate
6.747% fixed
Originated
March 2, 2026
Maturity
March 6, 2031
Payments
Interest only for the full term
Prepayment lockout ends
July 5, 2028
Prepayment premium ends
October 5, 2030 (yield maintenance)
Master servicer
Trimont, LLC
Originator
Wells Fargo Bank, National Association

Status

Payment status
Current (code 0)
Special servicing
No transfer reported
Defeasance
None reported

The property

Address
1500 Post Oak Boulevard, Houston, TX 77056
Metro
Houston-Pasadena-The Woodlands, TX
Rentable area
603,179 sq ft
Built
2016
Largest tenants
Woodside Energy
Value at securitization
$275.4M (Oct 2025)

Performance

Underwritten figures against the most recent reported figures
At securitizationLatest
DSCR (NOI)2.54xn/a
Occupancy100%n/a
Net operating income$24.3Mn/a

Watch flags

Computed from the BANK5 2026-5YR22 filing for the reporting period ending September 11, 2026, filed with the SEC September 29, 2026.

None this month. No flag in the cmbs.news screen applies to this loan.

cmbs.news's own rule-based labels on the filed fields (definitions), not a credit rating, a prediction or a view of the borrower.

The last 6 monthly reports

Report monthBalancePayment statusSpecial servicerDSCROccupancy
September 2026$140.0MCurrentNon/an/a
August 2026$140.0MPayment not received but still in grace period or not yet dueNon/an/a
July 2026$140.0MCurrentNon/an/a
June 2026$140.0MCurrentNo2.35xn/a
May 2026$85.0MCurrentNo2.35x100%
April 2026$60.0MCurrentNo2.35xn/a

From each trust's ABS-EE filing for that month. Coverage and occupancy change only when the servicer reports new statements. If one trust holding a piece of the loan skipped a month, that month's balance reads low.

Where the loan sits

The loan is split into 4 notes held by different trusts. Each trust reports its own piece.

Alert me when this loan changes

One email after any monthly filing that changes this loan: a move to or from the special servicer, a payment status of 30+ days late or matured, a paydown of 1% or more, or coverage moving 0.15x or occupancy 5 points. Privacy

Other Houston-Pasadena-The Woodlands loans due in 2031

Property Location Type Balance Rate Matures DSCR Occ. Status
1201 Lake Robbins The Woodlands, TX Office $250.0M 3.827% Oct 2031 2.84x 100% Current
West Memorial Place Houston, TX Office $106.0M 7.035% May 2031 n/a n/a Current
2700 Post Property Houston, TX Office $81.5M 4.46% Mar 2031 n/a n/a Current
HP Plaza Spring, TX Office $79.0M 7.01% Jun 2031 n/a n/a Current
Waterway Plaza I The Woodlands, TX Office $66.0M 3.269% Feb 2031 3.74x 100% Current
Fountains on the Lake Stafford, TX Retail $59.1M 3.776% Dec 2031 3.70x 97% Current
Bella Terra Richmond, TX Retail $52.3M 3.48% Dec 2031 3.12x 91% Current
4800-4900 Fournace Place Bellaire, TX Office $50.2M 3.351% Apr 2031 2.62x 99% Current

All loans maturing in 2031 · All Houston-Pasadena-The Woodlands loans

Source: each trust's ABS-EE asset-data exhibit (Regulation AB Schedule AL) on SEC EDGAR, reporting period ending September 11, 2026. Servicers report these figures; cmbs.news does not audit them. How this page is built.