Tenant exposure

HDR Engineering in CMBS

The trusts' filings name HDR Engineering among the three largest tenants at properties securing 5 public CMBS loans with $206.0M outstanding. It is the largest tenant at 4 of them. None of those loans is delinquent or with a special servicer.

Every loan

Property Location Type Balance Rate Matures DSCR Occ. Status
10 West End St. Louis Park, MN Office $78.0M 6.75% Jul 2031 n/a n/a Current
7 Penn Plaza New York, NY Office $51.5M 5.871% Jun 2030 3.43x 61% Current
50 Tice Corporate Center Woodcliff Lake, NJ Office $36.5M 5.88% Sep 2032 1.73x 100% Current
Folsom Gateway Folsom, CA Office $21.0M 3.49% Jan 2030 4.33x 98% Current
Marnell Corporate Center Las Vegas, NV Office $19.0M 4.84% Apr 2028 1.37x 93% Current

Where HDR Engineering is the largest tenant: lease end dates

PropertyLease endsLoan maturesBalance
Folsom GatewayOct 2026Jan 2030$21.0M
10 West EndDec 2028Jul 2031$78.0M
50 Tice Corporate CenterJan 2033Sep 2032$36.5M
7 Penn PlazaJul 2037Jun 2030$51.5M

Red: the lease ends before the loan matures, the rollover a refinancing lender will look at hardest.

Filed names grouped here: HDR ENGINEERING, INC.; HDR Engineering; HDR Engineering Inc.; Hdr Engineering Inc. From each trust's ABS-EE filing (largest, second and third largest tenant fields). Pro will alert you when any of these loans changes.