Office · Austin, Texas

Met Center 15

Met Center 15 is financed with a $28.3M CMBS loan at 3.612% that reaches maturity on March 6, 2030, in 3 years and 4 months. As of the Sep 2026 servicer report, the latest filed for this loan, its status is current.

The loan

Balance in tracked trusts
$28,280,546
Original balance (same notes)
$31,000,000
Interest rate
3.612% fixed
Originated
February 14, 2020
Maturity
March 6, 2030
Payments
Interest only for 24 months, then amortizing
Prepayment lockout ends
December 5, 2029
Master servicer
Trimont LLC
Originator
Barclays Capital Real Estate Inc.

Status

Payment status
Current (code 0)
Special servicing
No transfer reported
Defeasance
None reported

The property

Address
7301 Metro Center Drive, Austin, TX 78744
Metro
Austin-Round Rock-San Marcos, TX
Rentable area
257,600 sq ft
Built
2001
Largest tenants
Tokyo Electron U.S Holdings; Werner Co; Cogent Communications Inc.
Value at securitization
$53.5M (Nov 2019)

Performance

Underwritten figures against the most recent reported figures
At securitizationLatest (Mar 2026)
DSCR (NOI)2.33x0.88x
Occupancy100%69%
Net operating income (annualized from 3 months)$3.9M$1.5M
Debt yield5.4%

Debt yield here is the latest NOI divided by the balance held in the trusts below. If part of the loan sits outside them, the true figure is lower.

Watch flags

Computed from the Wells Fargo Commercial Mortgage Trust 2020-C56 filing for the reporting period ending September 11, 2026, filed with the SEC September 29, 2026.

  • Coverage below 1.00x
  • Coverage down 0.25x or more from securitization
  • Occupancy down 10 points or more from securitization
  • NOI down 20% or more from securitization

On the cmbs.news watch list in all 12 monthly reports we hold (October 2025 to September 2026).

cmbs.news's own rule-based labels on the filed fields (definitions), not a credit rating, a prediction or a view of the borrower.

What the filing shows

  • Occupancy has fallen from 100% when the loan was securitized to 69%.
  • Net operating income is 62% below the underwritten figure ($1.5M a year against $3.9M; the latest statement covers 3 months, annualized).
  • Debt service coverage moved from 2.33x at securitization to 0.88x on the latest statements.
  • At 0.88x, the property's reported NOI does not cover its debt service.

The last 12 monthly reports

Report monthBalancePayment statusSpecial servicerDSCROccupancy
September 2026$28.3MCurrentNo0.88x69%
August 2026$28.3MCurrentNo0.88x69%
July 2026$28.4MCurrentNo0.88x69%
June 2026$28.4MCurrentNo0.88x69%
May 2026$28.5MCurrentNo-0.25x52%
April 2026$28.5MCurrentNo-0.25x52%
March 2026$28.6MCurrentNo-0.25x52%
February 2026$28.7MCurrentNo-0.25x52%
January 2026$28.7MCurrentNo-0.25x52%
December 2025$28.8MCurrentNo-0.25x52%
November 2025$28.8MCurrentNo-0.25x52%
October 2025$28.9MCurrentNo-0.73x52%

From each trust's ABS-EE filing for that month. Coverage and occupancy change only when the servicer reports new statements. If one trust holding a piece of the loan skipped a month, that month's balance reads low.

Where the loan sits

One trust holds this loan in the data.

TrustLoan no.BalanceReport periodSource
Wells Fargo Commercial Mortgage Trust 2020-C569$28,280,546Sep 2026SEC filing, September 29, 2026

Alert me when this loan changes

One email after any monthly filing that changes this loan: a move to or from the special servicer, a payment status of 30+ days late or matured, a paydown of 1% or more, or coverage moving 0.15x or occupancy 5 points. Privacy

Other Austin-Round Rock-San Marcos loans due in 2030

Property Location Type Balance Rate Matures DSCR Occ. Status
MetCreative Buildings C & D Austin, TX Industrial $40.0M 5.136% Feb 2030 2.02x 100% Current
Lone Star Court Austin, TX Hotel $20.0M 3.49% Feb 2030 n/a n/a Current
Sonterra Townhomes & Apartments Jarrell, TX Multifamily $16.2M 3.909% Feb 2030 1.55x 77% Current
Twin Fountains Plaza Austin, TX Retail $7.8M 4.12% Jan 2030 3.36x 100% Current
Summit Park a Austin, TX Industrial $5.4M 3.699% Jan 2030 3.97x 94% Current

All loans maturing in 2030 · All Austin-Round Rock-San Marcos loans

Source: each trust's ABS-EE asset-data exhibit (Regulation AB Schedule AL) on SEC EDGAR, reporting period ending September 11, 2026. Servicers report these figures; cmbs.news does not audit them. How this page is built.