Office · Linthicum Heights, Maryland

Airport Square

800, 849, 900, & 930 International Drive, Linthicum Heights, MD · Google Maps

Public CMBS trusts hold $26.1M of the loan on Airport Square at 4.20% that reaches maturity on November 6, 2029, in 3 years. As of the Oct 2026 servicer report its status is current.

The loan

Balance in tracked trusts
$26,128,837
Original balance (same notes)
$30,000,000
Interest rate
4.20% fixed
Originated
November 4, 2019
Maturity
November 6, 2029
Payments
Amortizing over 30 years
Prepayment lockout ends
September 5, 2029
Master servicer
Trimont LLC
Originator
CCRE Lending

Status

Payment status
Current (code 0)
Special servicing
No transfer reported
Defeasance
None reported

The property

Address
800, 849, 900, & 930 International Drive, Linthicum Heights, MD 21090
Metro
Baltimore-Columbia-Towson, MD
Rentable area
232,936 sq ft
Built
1986, renovated 2018
Largest tenants
Northrop Grumman Systems Corporation; Northrop Grumman Systems Corporation; Advanced Mission partners LLC
Value at securitization
$44.4M (Aug 2019)

Performance

Underwritten figures against the most recent reported figures
MeasureAt securitizationLatest (Jun 2026)
DSCR (NOI)1.80x2.50x
Occupancy86%98%
Net operating income (annualized from 6 months)$3.2M$4.4M
Debt yield17.0%

Debt yield here is the latest NOI divided by the balance held in the trusts below. If part of the loan sits outside them, the true figure is lower.

Comparable loans: office properties in Baltimore-Columbia-Towson, MD, with NOI, occupancy and value.

Watch flags

Computed from the UBS Commercial Mortgage Trust 2019-C18 filing for the reporting period ending October 13, 2026, filed with the SEC November 2, 2026.

None this month. No flag in the cmbs.news screen applies to this loan.

cmbs.news's own rule-based labels on the filed fields (definitions), not a credit rating, a prediction or a view of the borrower.

What the filing shows

  • Occupancy has risen from 86% when the loan was securitized to 98%.
  • Net operating income is 40% above the underwritten figure ($4.4M a year against $3.2M; the latest statement covers 6 months, annualized).
  • Debt service coverage moved from 1.80x at securitization to 2.50x on the latest statements.
  • The filing gives May 2028 as the lease end date for the largest tenant (Northrop Grumman Systems Corporation), before the loan matures. Lenders look hard at that rollover.

Who is behind this loan

Guarantor and sponsor
Shown with Pro
Parties and contacts named by the trust
Shown with Pro

Source: SEC Form 424B2 prospectus, Annex A-1, filed Dec 2019.

Source: SEC Form 10-D, Exhibit 99.1 distribution statement, filed Oct 2026.

See names and contacts with Pro

Refinance test on today's income

The latest annual NOI in the filing is $4.4M, a debt yield of 17.0% on $26.1M. Lenders often size a new loan so NOI is at least 9% to 10% of the loan amount.

Debt yield a lender requiresLargest loanAgainst today's balance
9%$49.2M $23.1M of room
10%$44.3M $18.2M of room

Arithmetic on the filed NOI only: no rates, reserves, cap rates or lender terms. NOI can be a year old; see the statement dates above.

Operating statement

AnnualAt securitizationLatest, Jun 2026Per sq ft
Revenue$4.4M$11.6M$50.24/sf
Operating expenses$1.3M$2.7M$11.82/sf
Net operating income$3.2M$4.4M$19.21/sf
Net cash flow$3.0M$8.5M$36.79/sf
Expense ratio28.5%23.5%

From the servicer's Schedule AL report; the latest statement covers 6 months and is annualized; 230,737 sq ft; renovated 2018.

Largest tenants

TenantSq ftShare of buildingLease ends
Northrop Grumman113,16849% May 2028
Advanced Mission Partners LLC - SSAI32,15214% Sep 2029
USA ACOE23,26610% Dec 2025

Red: the lease ends before the loan matures.

Refinance and early payoff, at today's rates

This estimate uses today's Treasury curve and needs JavaScript.

Rough estimates, not quotes. New loan: the filed NOI divided by the coverage you set, at the Treasury yield for the term plus your spread. Early payoff: the present value of the remaining scheduled payments to the open date at today's Treasury yields, less the balance, which is roughly what defeasance or yield maintenance costs. Loan documents, fees and the securities bought change the real number. Treasury yields: U.S. Treasury daily par curve.

The last 12 monthly reports

Report monthBalancePayment statusSpecial servicerDSCROccupancy
October 2026$26.1MCurrentNo2.50x98%
September 2026$26.2MCurrentNo2.72x98%
August 2026$26.2MCurrentNo2.72x98%
July 2026$26.3MCurrentNo2.72x98%
June 2026$26.3MCurrentNo2.33x98%
May 2026$26.4MCurrentNo2.49x98%
April 2026$26.4MCurrentNo2.49x98%
March 2026$26.5MCurrentNo2.49x98%
February 2026$26.6MCurrentNo2.49x98%
January 2026$26.6MCurrentNo2.49x98%
December 2025$26.7MCurrentNo2.47x98%
November 2025$26.7MCurrentNo2.47x98%

From each trust's ABS-EE filing for that month. Coverage and occupancy change only when the servicer reports new statements.

Full history back to December 2019. See it with Pro.

Where the loan sits

The loan is split into 2 notes held by different trusts. Each trust reports its own piece.

TrustAsset no. in that trustBalanceReport periodSource
CF 2019-CF3 Mortgage Trust12$21,774,031Oct 2026SEC filing, October 29, 2026
UBS Commercial Mortgage Trust 2019-C1846$4,354,806Oct 2026SEC filing, November 2, 2026

Alert me when this loan changes

One email the morning after a monthly filing changes this loan: a move to or from the special servicer, a payment 30 or more days late, a missed or changed maturity, a paydown of 1% or more, a payoff, a modification or workout, a lower valuation or an appraisal reduction, or coverage falling under 1.00x. Privacy

We'll email you once to confirm. Unsubscribe any time.

Other Baltimore-Columbia-Towson loans due in 2029

Property Location Type Balance Rate Matures DSCR Occ. Status
Fieldside Grande Aberdeen, MD Multifamily $52.3M 6.06% Jul 2029 1.34x 95% Current
Hilton Baltimore BWI Airport Linthicum Heights, MD Hotel $34.9M 4.799% Apr 2029 1.57x 82% Current
Patuxent Crossing Columbia, MD Office $33.2M 4.60% Apr 2029 1.08x 67% Current
McGaw Commerce Center Columbia, MD Industrial $32.5M 6.823% Apr 2029 1.15x 93% Current
Dundalk Plaza Baltimore, MD Retail $27.3M 7.20% Aug 2029 1.53x 99% Current
Knightsbridge and Sheffield House Apartments Baltimore, MD Multifamily $9.1M 7.05% Jan 2029 1.36x 90% Current
Hyatt Place Baltimore Owings Mills Owings Mills, MD Hotel $6.3M 8.23% Jan 2029 1.61x 54% Current
Schnader Enterprises Portfolio Baltimore, MD Multifamily $6.0M 4.52% Jun 2029 2.22x 91% Current

All loans maturing in 2029 · All Baltimore-Columbia-Towson loans

Source: each trust's ABS-EE asset-data exhibit (Regulation AB Schedule AL) on SEC EDGAR, reporting period ending October 13, 2026. Servicers report these figures; cmbs.news does not audit them. How this page is built.

Something wrong with this loan?