Industrial · Detroit, Michigan

Gateway Industrial Center

Public CMBS trusts hold $93.0M of the loan on Gateway Industrial Center at 6.74% that reaches maturity on July 6, 2030, in 3 years and 8 months. As of the Sep 2026 servicer report, the latest filed for this loan, its status is late, less than 30 days.

The loan

Balance in tracked trusts
$93,000,000
Original balance (same notes)
$93,000,000
Interest rate
6.74% fixed
Originated
June 9, 2025
Maturity
July 6, 2030
Payments
Interest only for the full term
Prepayment lockout ends
January 5, 2030
Master servicer
Trimont LLC
Originator
Argentic Real Estate Finance 2 LLC

Status

Payment status
Late payment but less than 30 days delinquent (code B)
Special servicing
No transfer reported
Defeasance
None reported

The property

Address
12601 and 12701 Southfield Freeway, Detroit, MI 48223
Metro
Detroit-Warren-Dearborn, MI
Rentable area
1,441,839 sq ft
Built
1948, renovated 2023
Largest tenants
Detroit Manufacturing Systems, LLC; Tiberina Detroit, Inc.; Quaker Houghton PA, Inc.
Value at securitization
$160.3M (Jun 2026)

Performance

Underwritten figures against the most recent reported figures
At securitizationLatest
DSCR (NOI)1.30xn/a
Occupancy78%n/a
Net operating income$8.3Mn/a

Watch flags

Computed from the Wells Fargo Commercial Mortgage Trust 2025-5C5 filing for the reporting period ending September 11, 2026, filed with the SEC September 29, 2026.

  • Largest tenant's lease ends within 12 months

cmbs.news's own rule-based labels on the filed fields (definitions), not a credit rating, a prediction or a view of the borrower.

What the filing shows

  • The filing gives Sep 2027 as the lease end date for the largest tenant (Detroit Manufacturing Systems, LLC), before the loan matures. Lenders look hard at that rollover.

The last 12 monthly reports

Report monthBalancePayment statusSpecial servicerDSCROccupancy
September 2026$93.0MLate payment but less than 30 days delinquentNo0.78x72%
August 2026$93.0MCurrentNo0.78x72%
July 2026$94.8MCurrentNo0.87x72%
June 2026$93.0MCurrentNo0.87x72%
May 2026$93.0MCurrentNo0.87x72%
April 2026$93.0MCurrentNo0.87x72%
March 2026$93.0MCurrentNon/an/a
February 2026$93.0MCurrentNon/an/a
January 2026$93.0MCurrentNon/an/a
December 2025$93.0MCurrentNon/an/a
November 2025$93.0MCurrentNon/an/a
October 2025$77.8MCurrentNon/an/a

From each trust's ABS-EE filing for that month. Coverage and occupancy change only when the servicer reports new statements. If one trust holding a piece of the loan skipped a month, that month's balance reads low.

Where the loan sits

The loan is split into 6 notes held by different trusts. Each trust reports its own piece.

Alert me when this loan changes

One email after any monthly filing that changes this loan: a move to or from the special servicer, a payment status of 30+ days late or matured, a paydown of 1% or more, or coverage moving 0.15x or occupancy 5 points. Privacy

Other Detroit-Warren-Dearborn loans due in 2030

Property Location Type Balance Rate Matures DSCR Occ. Status
The Westin Book Cadillac Detroit, MI Hotel $75.0M 4.39% Feb 2030 0.83x 63% Current
The Draxton Hotel 2.0 Birmingham, MI Hotel $50.0M 6.82% Aug 2030 2.32x 67% Current
Infinity Park Apartments Detroit, MI Multifamily $38.0M 5.613% Dec 2030 n/a n/a Current
Southfield Westin Southfield, MI Hotel $37.9M 7.395% May 2030 2.01x 70% Current
Lewis Technology Centre Novi, MI Office $30.6M 3.688% Feb 2030 n/a n/a Current
The Standard Farmington Hills, MI Office $28.7M 3.672% Nov 2030 0.48x 35% Current
Brewery Park - Phase II Detroit, MI Office $27.1M 4.035% Sep 2030 n/a n/a Current
Gale Gardens Individual Property Melvindale, MI Multifamily $21.4M 3.85% Mar 2030 n/a n/a Current

All loans maturing in 2030 · All Detroit-Warren-Dearborn loans

Source: each trust's ABS-EE asset-data exhibit (Regulation AB Schedule AL) on SEC EDGAR, reporting period ending September 11, 2026. Servicers report these figures; cmbs.news does not audit them. How this page is built.